New 32.5 Million building works announced for Unley High School.
![](https://uhs.sa.edu.au/wp-content/uploads/2020/03/newbuild1.jpg)
Featuring:
- New 3 story building which will be home to Art, Home Ec, Tech and Design
- Dedicated year 9 space located on level 2 of the new building
- New front of school on Kitchener Street
- Covered Outdoor Learning Area (COLA)
- Refurbishment of existing classrooms to open plan flexible learning spaces
![](https://uhs.sa.edu.au/wp-content/uploads/2020/03/newbuild2-1024x576.jpg)
![](https://uhs.sa.edu.au/wp-content/uploads/2020/03/front2-1024x576.jpg)
New Front of School
New front of school, located on Kitchener Street.
![](https://uhs.sa.edu.au/wp-content/uploads/2020/03/front.jpg)
New Covered Outdoor Learning Area (COLA)
![](https://uhs.sa.edu.au/wp-content/uploads/2020/03/newbuild7-1024x576.jpg)
Refurbishment of Existing Classrooms
Existing classrooms to be refurbished to open plan, flexible learning spaces.
![](https://uhs.sa.edu.au/wp-content/uploads/2020/03/classroom-1024x683.jpg)